DRILLING APPLICATIONS
Stuck Drilling Assembly
Stuck Fishing Assembly
Liner Running and Recovery
Casing Recovery For Sidetrack
Vibration Technology has pioneered the design and development of vibration equipment for oilfield applications . . . First in workover and then, after drawing on experience gained from hundreds of wells, high hook load equipment suitable for most drilling applications.
Surface Rig-Up and Operation
No downhole intervention.
Pipe vibration can be quickly applied with very little preparation.
Quick to rig-up
Approximately 2 hours are required for complete set up.
Current Location
Strategically located at our facility in Stanton, Texas.
Rapid Results
Pipe vibration offers a low risk, high reward, first means for pipe recovery operations. Results can be achieved rapidly, substantially reducing time and effort required to solve stuck pipe problems.
Compact Package
Readily transportable.
Two offshore lifts.
500,000 and 360,000 Lb Working Load Capacity
Suitable for most drilling applications.
Stuck Fishing Assembly
Liner Running and Recovery
Casing Recovery For Sidetrack
Vibration Technology has pioneered the design and development of vibration equipment for oilfield applications . . . First in workover and then, after drawing on experience gained from hundreds of wells, high hook load equipment suitable for most drilling applications.
Surface Rig-Up and Operation
No downhole intervention.
Pipe vibration can be quickly applied with very little preparation.
Quick to rig-up
Approximately 2 hours are required for complete set up.
Current Location
Strategically located at our facility in Stanton, Texas.
Rapid Results
Pipe vibration offers a low risk, high reward, first means for pipe recovery operations. Results can be achieved rapidly, substantially reducing time and effort required to solve stuck pipe problems.
Compact Package
Readily transportable.
Two offshore lifts.
500,000 and 360,000 Lb Working Load Capacity
Suitable for most drilling applications.