DRILLLING CASE HISTORIES
PDF
Vibration Technology's 500K Hook Load Capacity Oscillator Features:
No downhole intervention
-Pipe vibration can be quickly applied with very little preparation
Quick to rig-up
-Approximately 2 hours are required for complete set up.
Convenient Location
-Strategically located at our Gulf Coast facility near Lafayette, Louisiana.
Compact Package
-Readily transportable
-Two offshore lifts
500,000 Lb Working Load Capacity
-Suitable for most drilling and casing operations
No downhole intervention
-Pipe vibration can be quickly applied with very little preparation
Quick to rig-up
-Approximately 2 hours are required for complete set up.
Convenient Location
-Strategically located at our Gulf Coast facility near Lafayette, Louisiana.
Compact Package
-Readily transportable
-Two offshore lifts
500,000 Lb Working Load Capacity
-Suitable for most drilling and casing operations